Skip to main content
The last pic of the front end is pretty much as is now, only difference is it all fits and the wheel goes round. Disc found to be 2.9mm so way below min wear, have ordered a better one, New wheel bearings were being fitted last night till I hit my thumb instead of the drift. Ouch!
I'll finish that off when the bleeding stops.
Had to take a bit off the caliper mounting lugs, also off the lugs on the forks. Spacers for the disc 3mm out from wheel and a couple of mm off back of caliper body. So now Caliper clears wheel spokes, Caliper is central over disc and wheel is central between forks. Made Axle out of RS/GSXR and machined new alloy collar for non disc side. New tyre fitted on a nice sunny day in the garden last weekend. Just a few new fasteners to come this week and I can bolt it up for the final time.
Brake line from RS was too short so one coming soon 625mm long and that's about it, hopefully.
This conversion is just about do-able but its not easy. If you are shy about cutting material from calipers or mounts then don't attempt it. I'll be keeping a careful eye on it for cracking etc.

Comments

  1. hi
    do you have a e-mail adres ?
    I have an exact same building on going.

    tony

    ReplyDelete

Post a Comment

Popular posts from this blog

Engine Vibrations

Well after riding Stuarts 640 supermoto and this bike back to back, the vibration had to be coming from somewhere. The rear mount was one thing I hadn't paid too uch attention to when I started the project. Stripped it down at the weekend. I dropped the back of the engine and managed to drift one of the top hat spacers out, but the other one wasn't  having it. Decided to take engine right out to get better access. Was thinking I might have to drill it out. Made a drift from a long stainless bolt and machined the head in the lathe making the lip thinner eventually, with the lip about .5mm thick I got a good contact with the end of the bush and got the bugger out. Both the spacers were about 1mm oversize on the ID so the back of the engine had about 1mm of play.  Next job is to make some new spacers and fit them, have ordered some bar stock for that. May move the oil cooler while its apart.
Been working on cooling system now exhaust is done. Bought TDM850 Rad which has a pressure cap thinking i wouldn't need a separate expansion tank. Now the rad is mounted as high as i can get it, the filler is not the highest point on the system so will need a small expansion tank to fill from. Ordered a RS125 one that should do the job. Fitted some hoses but need some more bends to plumb the red in neatly. Its very congested and tricky round the water pump area.